Commercial Building
Three-floor office tower. HVAC, central plant, emergency power.
A three-floor office tower. One rooftop HVAC unit per floor, central chilled-water plant, hot-water heating loop, supply fan motors, one standby emergency diesel generator.
Mixed asset ages across floors and plant equipment: floor-3 HVAC at 12,000 hours, floor-2 at 8,000, boiler at 7,000, chilled-water pump at 4,000, AHU fan motors at 5,000. Older units run warmer, pull more power, and work the heating loop harder.
What's running
| Area | Assets |
|---|---|
| HVAC | Rooftop units |
| Chilled water | Central chiller, circulation pump |
| Heating | Boiler, heating-loop pump |
| Electrical | AHU fan motors, standby emergency diesel generator |
Use cases
- Building management system demo in plain terms.
- Occupancy-driven HVAC behaviour across floors.
- Newer and older building equipment in one run.
- Backup power within a building context.
Launch
Console ⭢ Catalog ⭢ Commercial Building ⭢ Launch. No restart required.
Verified
In Catalog, Commercial Building shows the active instances and models. Fleet view keeps updating after launch.
Next
Connect a protocol
Hook a downstream system to the running environment.
Map into Litmus Edge
Map this environment into Litmus Edge.
Was this page useful?
Last updated on
Miravo